13403 Redfish Lane
825 W. Bitters Rd., Suite 203
3005 S. Lamar Blvd., D109

This project rehabbed Dam 22 for the Upper Brushy Creek WCIP to new design standards. The scope included replacing the existing principal spillway with a larger diameter AWWA C-300 Pipe, new intake structure with sluice gate, new outlet spillway basin and regrading the downstream slope.