This project rehabbed Dam 22 for the Upper Brushy Creek WCIP to new design standards. The scope included replacing the existing principal spillway with a larger diameter AWWA C-300 Pipe, new intake structure with sluice gate, new outlet spillway basin and regrading the downstream slope.